Site 65
Name:
Burma Road
Address:
Shoulder of Burma Road between Conrad Drive
and Morris Pesin Drive
Jersey City, N.J. 07305
NJDEP ID No.
G000008693
April 2020: Consent Judgment Compliance Letter
May 2019: Remedial Action Report
Appendices
Appendix A: Soil Boring Logs
Appendix B: Figures April 2013 RIR Tetra Tech
Appendix C: Analytical Summary Tables April 2013 RIR Tetra Tech
Appendix D: January 2018 Settlement Agreement
Appendix E: Water Line Cross Sections
Appendix F: Notice in Lieu of Deed Notice (Draft)
Appendix G: Laboratory Analytical Packages/Data Validation Reports
Tables
Table 1: Post-Excavation Sample Summary Table
Table 2: Excavation Base Soil Samples Complete Summary Laboratory Analytical Data
Table 3: Sidewall Soil Samples Complete Summary Laboratory Analytical Data
Table 4: Delineation Boring Sample Summary (2015-2016)
Table 5: Burma Road Delineation Soil Boring Analytical Summary Table
Table 6: Morris Pesin Drive and Traffic Circle Delineation Soil Boring Analytical Summary Table
Table 7: Roadway Soil Boring TAL Metals Analytical Summary Table
Figures
Figure 1: Site 65 Boundary
Figure 2: (Sheet 1 of 5) Site 65 CCPW Metals Post-Excavation and Remedial Investigation Soil Sample Locations
Figure 2: (Sheets 2 through 5 of 5) CCPW Metals Burma Road, Morris Pesin Drive and Traffic Circle Soil Sample Locations
Figure 3: (Sheets 1 through 4 of 4) Target Analyte List Metals Remedial Investigation Borings
Figure 4: Observed Blooming and Petroleum Impacts
Figure 5: Soft-Dig Locations for Water Line Identification
Site Remediation Reform Act Forms
Case Inventory Document
Cover/Certification Form
Remedial Action Report Form
Receptor Evaluation Form
Alternative or New Remediation Standard and/or Screening Level Application
August 2013: Final Remedial Action Work Plan Hudson County Chrome Sites 63 and 65
Figures
Figure 1: Site Location Map
Figure 2: Site Plan
Figure 3: Areas Requiring Remediation - Soils – Cross-Section A-A’
Figure 4: Areas Requiring Remediation - Soils – Cross-Section B-B’
Figure 5: Areas Requiring Remediation - Groundwater
Figure 6: Design Boring Sample Location Map
Appendices
Appendix A: Remedial Investigation Report Figures and Tables
Appendix B: Field Sampling and Analysis Plan and Quality Assurance Control Plan
Appendix C: Erosion and Sediment Control Plan
Appendix D: Example Health and Safety Plan
Appendix E: Spectra Excavation Management Plan
April 2013: Remedial Investigation Report
Tables
Table 1: Soil Boring Characteristics
Table 2: Analytical Methods
Table 3: Monitoring Well Characteristics
Table 4: Soil Remediation Standards/Screening Levels for Soil, Groundwater, Surface Water, and Sediment
Table 5: Positive Hits Table for Soil Samples, Initial Investigation, Minimum Soil Remediation Standard/Screening Level
Table 5A: Table of Exceedances for Soil Samples, Initial Investigation, Residential Direct Contact Soil Remediation Standards
Table 5B: Table of Exceedances for Soil Samples, Initial Investigation, Non-Residential Direct Contact Soil Remediation Standards
Table 5C: Table of Exceedances for Soil Samples, Initial Investigation, Impact to Groundwater Soil Screening Level
Table 6: Frequency of Detection Table for Soil Samples, Initial Investigation
Table 7: Frequency of Detection Table for Surface Soil Samples, Initial Investigation
Table 8: Frequency of Detection Table for Subsurface Soil Samples, Initial Investigation
Table 9: Positive Hits Table for Groundwater Samples, Initial Investigation
Table 10: Frequency of Detection Table for Groundwater Samples, Initial Investigation
Table 12: Positive Hits Table for Sediment Samples, Initial Investigation
Table 13: Positive Hits Table for Soil Samples, Delineation Investigation, Minimum Soil Remediation Standard/Screening Level
Table 13A: Table of Exceedances for Soil Samples, Delineation Investigation, Residential Direct Contact Soil Remediation Standard
Table 13B: Table of Exceedances for Soil Samples, Delineation Investigation, Non-Residential Direct Contact Soil Remediation Standard
Table 13C: Table of Exceedances for Soil Samples, Delineation Investigation, Impact to Groundwater Soil Screening Level
Table 14: Frequency of Detection Table for Soil Samples, Delineation Investigation
Table 15: Frequency of Detection Table for Surface Soil Samples, Delineation Investigation
Table 16: Frequency of Detection Table for Subsurface Soil Samples, Delineation Investigation
Table 17: Positive Hits Table for Groundwater Samples, Delineation Investigation
Table 18: Frequency of Detection Table for Groundwater Samples, Delineation Investigation
Table 19: Comparison of Surface Soil Results to Ecological Criteria, Initial Investigation
Table 20: Comparison of Surface Soil Results to Ecological Criteria, Delineation Investigation
Table 21: Comparison of Groundwater Results to Ecological Surface Water Screening Criteria, Initial Investigation
Table 22: Comparison of Groundwater Results to Ecological Surface Water Screening Criteria, Delineation Investigation
Figures
Figure 1: Site Location
Figure 2: Site Layout
Figure 3: Cross Section A-A’
Figure 4: Cross Section B-B’
Figure 5: 2011 Groundwater Contour Map
Figure 5A: 2013 Groundwater Contour Map
Figure 6: Soil Sample Results, Initial Investigation
Figure 7A: Soil Sample Exceedances of Residential Direct Contact Soil Remediation Standards
Figure 7B: Soil Sample Exceedances of Impact to Groundwater Soil Screening Levels
Figure 8: Groundwater Sample Results
Figure 9: Groundwater Sample Exceedances
Figure 10: Chromium 2011 Isoconcentration Map
Figure 11: Antimony 2011 Isoconcentration Map
Figure 12: Nickel 2011 Isoconcentration Map
Figure 13: Vanadium 2011 Isoconcentration Map
Figure 14: Soil Sample Results, Delineation Investigation
Figure 15: Chromium 2013 Isoconcentration Map
Figure 16: Hexavalent Chromium 2013 Isoconcentration Map
Figure 17: Antimony 2013 Isoconcentration Map
Figure 18: Nickel 2013 Isoconcentration Map
Figure 19: Vanadium 2013 Isoconcentration Map
Figure 20: Limit of Contamination (Residential Direct Contact Exceedances in Soil)
Appendices
Appendix A: Historical Sample Results and Interim Measures
Appendix B: Health and Safety Plan
Appendix C-1: Initial RI Soil Boring Logs
Appendix C-2: Delineation RI Soil Boring Logs
Appendix D-1: Initial RI Groundwater Field Sheets
Appendix D-2: Delineation RI Groundwater Field Sheets
Appendix E: IDW Results
Appendix F: Data Validation
Appendix G: Ecological Evaluation Supporting Information
Appendix H: Site-Specific IGW Calculations
Appendix I: Soil Results
Appendix J: Groundwater Results
Appendix K: Utility Information
Appendix L: Surface Water Results
Appendix M: Sediment Results
ABOUT US
|
PROGRESS REPORTS
|
CLEANUP REPORTS
|
HEALTH & SAFETY
|
CONTACT
© 2009 - 2023 CHROMIUM CLEANUP PARTNERSHIP