Site 174
Name:
Dennis Collins Park
Address:
West First Street
Bayonne, N.J. 07002
Municipal Blocks and Lots:
Block 383, Lots 3-8
Block 384, Lots 1-2
Block 385, Lots 1,2,3,4 and 6
NJDEP ID No.
G000011472
August 2024: Site 174 Consent Judgment Compliance Letter (Soil)
November 2022: Remedial Action Report Hudson County Chromate Site 174
Appendices
Appendix A: Preliminary Site Characterization Excerpts Kimball, 2001
Appendix B: NJDEP IGWSRS Approvals
Appendix C: Project AMPs
Appendix D: Response to NJDEP Comments
Appendix E: Laboratory Analytical Packages
Appendix F: Data Validation Reports
Appendix G: As-Built Surveys
Appendix H: Technical Memoranda GGM Area
Appendix I: Deed Notice
Appendix J: Notice in Lieu of Deed Notice
Appendix K: Boring Logs
Appendix L: Hazardous Waste Disposal Documentation
Appendix M: Non-Hazardous Waste Disposal Documentation
Appendix N: Clean Fill Documentation
Appendix O: Monthly Inspection Reports
Appendix P: Monitoring Well Information
Appendix Q: City of Bayonne Design Drawings April 2020
Appendix R: Variance from Technical Requirements Supporting Information
NJDEP Forms
Case Inventory Document
Cover Certification Form
Receptor Evaluation Report
Receptor Evaluation Report (Attachment)
August 2019_Remedial Investigation Report Addendum/Remedial Action Work Plan for Soil (AOC-1
Appendices
Appendix A: Historical Environmental Report Excerpts
Appendix B: APTIM Soil Boring Logs
Appendix C: Laboratory Analytical Data Packages 2013 and 2015
Appendix D: Data Validation Reports 2013 and 2015
Appendix E: Proposed Remedial Action Site Plan
Appendix F: Revetment Engineering Design Analysis
Appendix G: Draft Institutional Controls
Appendix H: Remedial Action for Soil Operations and Maintenance Plan
September 2012: Remedial Action Work Plan – Site 174, Dennis P. Collins Park
Appendices
Appendix A: Sanborn Maps
Appendix B: Historical Aerial Photos
Appendix C: Selected Information from Previous Investigations
Appendix D: Field Sampling Plan – Quality Assurance Project Plan
Appendix E: Health and Safety Plan
Appendix F: Project Field Schedule
Appendix G: Utility Maps
Appendix H: Air Monitoring Plan
Appendix I: AECOM 2012 Investigation Boring Logs and Data Validation Report
Appendix J: AECOM 2012 Investigation Lab Data Report
Appendix K: AECOM 2012 Investigation EDD
Appendix L: NJDEP Remedial Action Workplan Form
ABOUT US
|
PROGRESS REPORTS
|
CLEANUP REPORTS
|
HEALTH & SAFETY
|
CONTACT
© 2009 - 2023 CHROMIUM CLEANUP PARTNERSHIP